Townhouse Condo Reserve Funds: What Boards Get Wrong About Roofs and Roads

November 5, 2026

Roofs and private roads are the biggest items in most townhouse reserve funds. Six mistakes boards make, and how to avoid them.

Architectural drawing of a house roof structure for capital planning

Ask a townhouse condominium board what keeps them up at night and the answer is usually the same: the roofs and the roads. These are the biggest-ticket items in most townhouse reserve funds, and they are where underfunding hurts most. When the money is not there, owners face a special assessment or a loan, often just as the roofs start to leak.


Townhouse corporations are not small versions of a high-rise. Their reserve fund risks look different, and so do the mistakes. Here are the ones we see most often, and how boards can avoid them.


Why townhouse reserve funds are different

A high-rise concentrates its big components in one building: one roof, one set of elevators, one garage. A townhouse community spreads them across dozens of separate buildings and a network of private roads. That means:


· Many roofs, often installed in the same year, that wear out together.
· Private roads, curbs, catch basins and parking areas that the corporation, not the city, must repair and replace.

· Long runs of fencing, decks, retaining walls and walkways.

· Windows, doors and siding that may be the corporation's responsibility, the owner's, or split between them, depending on the declaration.


Mistake 1: Treating the reserve fund study as a formality

Ontario corporations must complete a comprehensive (Class 1) reserve fund study in the first year after registration, then update it at least every three years, alternating updates with a site inspection (Class 2) and without one (Class 3). After a study arrives, the board has 120 days to review it and propose a plan for future funding, and must send owners a notice of that plan. Our guide to reserve fund studies in Ontario explains the deadlines in more detail.


The study is only as good as the information behind it. Before the provider starts, give them your declaration, past repair records and contractor reports, and walk the site with them if you can. Check the component list against what is actually on the property. A missing retaining wall or an outdated roof date can throw off the whole funding plan.


Mistake 2: Ignoring the "all at once" problem

If every roof in the community was installed when the corporation was built, every roof may need replacing within a few years of each other. A study can show a healthy balance right up to the moment the bills arrive. Ask your provider and manager whether major work can be phased across several years, and test what happens to the fund if prices rise faster than expected. Phasing often smooths the contributions owners have to make.


Mistake 3: Not knowing who is responsible for what

Townhouse declarations vary widely. In one corporation the roof is a common element repaired from the reserve fund; in another, owners may be responsible for parts of their own exterior, or exclusive-use areas such as decks and driveways may carry special rules. If the study, the budget and the declaration do not agree, the corporation may be saving for things it does not have to pay for, or not saving for things it does. Have your manager check the declaration against the component list.


Mistake 4: Underestimating the roads

Roads are easy to overlook because they wear slowly and quietly. But a private road is more than its surface layer. The granular base, curbs, catch basins and drainage all age, and water that cannot drain properly shortens the life of everything around it. Freeze-thaw cycles, snow ploughing and salt add to the wear every winter. Make sure the study distinguishes between resurfacing and full reconstruction, and includes the catch basins and storm drainage that sit under the pavement.


Mistake 5: Holding fees flat for too long

Boards understandably want to keep common expenses steady. But holding contributions flat for years usually means a large catch-up increase or a special assessment later, when more owners will feel it. Small, regular increases that follow the funding plan are almost always the least painful route, and they make the corporation easier to sell into because buyers see the plan in every status certificate.


Mistake 6: Waiting for the next study to react

Three years is a long time on a townhouse property. A storm, a failed section of road, a building condition report or a big jump in contractor prices can make the study out of date. Boards do not have to wait: a study can be updated early when circumstances change. Between studies, your manager should track component condition at the spring and fall inspections and flag anything that is ageing faster than planned.


A short checklist for townhouse boards

· Give the study provider your declaration, repair history and contractor reports.
· Check the component list against the site, building by building.

· Ask whether roof and road work can be phased.

· Confirm who is responsible for roofs, windows, decks and driveways under your declaration.

· Make sure roads include the base, curbs, catch basins and drainage.

· Follow the funding plan with small, regular increases.

· Update the study early if something major changes.


How Enfield helps

Townhouse and low-rise corporations make up most of the 2,000+ units The Enfield Group manages. We advise boards on budgets, capital planning and reserve fund requirements, help them obtain reserve fund studies every three years, and prepare budgets that keep enough capital in reserve for the work ahead. As developers ourselves, including Stonecroft Townhomes and 509 Elizabeth Street in Burlington, we understand how townhouse communities are built and how they age.


Learn more about our townhouse condo management, or see how we serve newer townhouse communities in Milton. To talk about your corporation, call 905-689-7341 or request a proposal.


This article is general information about Ontario condominiums, not legal or engineering advice. Speak with your corporation's lawyer and reserve fund study provider about your situation.

Snow-covered path and street lamps on a winter evening
November 5, 2026
A winter plan for Hamilton and Halton townhouse condo boards: snow contracts, salting, visit logs, roofs, pipes and owner notices.
Empty boardroom table ready for a condo board meeting
November 5, 2026
A 2027 checklist for Ontario condo boards changing management companies: the contract, notice, proposals, licences, records and the handover.
Hand signing a document at a desk
November 5, 2026
Ontario condo managers and management firms must be licensed by the CMRAO. How boards and owners can check a licence, and what to look for.
The Madison under construction on the Hamilton Mountain brow
November 5, 2026
From a Hamilton window shop in 1927 to 2,000+ units today: four lessons from four generations of the Fraleigh family in property management.
Empty condominium unit interior with tall windows and a fireplace
November 4, 2026
What to check in an Ontario condo status certificate before you buy: fees, arrears, special assessments, the reserve fund, lawsuits and the rules.
Hammer, wrench and tools laid on building plans
November 4, 2026
How reserve fund studies work for Ontario condo corporations: the three classes, the three-year cycle, the 120-day review rule and owner notice.
White condominium apartment building against a blue sky
November 4, 2026
Why Ontario condo corporations levy special assessments, how they are decided and paid, what happens if an owner can't pay, and how boards avoid them.
Orange pumpkin, knit blanket and coffee cup beside October in white script on dark wood
By Greg Fraleigh • November 4, 2026
A fall checklist: change furnace filters, shut off outside water lines, book your winter tire changeover, buy ice melt early and tune up the snowblower.
By Gregory P Fraleigh • May 6, 2022
Hi everyone! We will be closing the office early today so that our staff can attend the Canadian Condominium Institute - Grand River Chapter's conference at the Bingeman's Conference Centre at 425 Bingemans Centre Drive, Kitchener, Ontario. Our office will be closing at 11:00 a.m. Emergency calls will be responded to and we will be back in the office bright and early on Monday morning.
By Gregory P Fraleigh • April 29, 2022
It has been far too long since we've been able to see each other in person, and now, we're back! The Enfield Group Inc. will be exhibiting at booth #23 and will have information on our services, as well as some prize-pack goodies, to hand-out. Our team of Property Managers will all be in attendance for what will no doubt be a very informative and relationship building day. Come and say hello! We're looking forward to meeting you in person.